PROJECT TO ADAPT THE RAÍCES QUAY TO NEW TRAFFIC

The draft at the Raíces Quay is increased from the current 8.7 m to 14 m by extending the quay.Dredging is carried out on Category C contaminated material, so after an alternatives study, the sheet pile solution is selected.Environmental protection of the surroundings is of vital importance, as the works are located in NATURA 2000 […]
CONSTRUCTION PROJECT FOR THE NORTH EXTENSION OF THE SOUTH WHARF, HUELVA

Extension of the South Wharf by a length of 525 m to enable the berthing of container vessels of 6,400 and 9,000 TEU by means of a sheet pile wall wharf. The characteristics of the extended wharf are: • Crown elevation: +6.50 m • Design dredging elevation: -17.0 m • 2 standard sectionsThe following main […]
ALTERNATIVE DESIGN PROJECT FOR THE EXTENSION OF THE ATTACHED QUAY 2ND PHASE B (MULTIPURPOSE TERMINAL) PALMA DE MALLORCA

The works under this project are intended to extend the 2nd alignment of the Attached Quay to create an additional 290 m berthing line with a 16.00 m draft, planned in the short to medium term for the expansion of the adjacent container terminal, and in the medium to long term to allow, where applicable, […]
CONSTRUCTION PROJECT FOR THE NORTH EXTENSION OF THE SOUTH WHARF HUELVA

Extension of the South Wharf by a length of 525 m to enable the berthing of container vessels of 6,400 and 9,000 TEU by means of a sheet pile wall wharf. The characteristics of the extended wharf are: • Crown elevation: +6.50 m • Design dredging elevation: -17.0 m • 2 standard sections The following […]
VARIANT PROJECT FOR THE EXPANSION OF THE ESPLANADE AT THE NORTH PONIENTE WHARF OF THE PORT OF PALMA

This involves the preparation of the Variant Solution to the Base Project. The work consists of advancing the berthing front of the North Poniente Wharf, extending the berthing front of the current Poniente Wharf Expansion and ending with a Ro-Ro heel against the Second Extension of the Poniente Wharf. The following works are carried out […]
CALCULATIONS FOR THE GRANADILLA COUNTERBREAKWATER (TENERIFE, CANARY ISLANDS)

As part of the works for the new Port of Granadilla, the construction of a counterbreakwater is included. The calculations carried out in this study are due to the installation of a buoy in the Port area, which modified the design wave climate. In addition, the change in the works schedule means that the counterbreakwater […]
VARIANT PROJECT FOR THE SECOND SECTION OF THE MULTIPURPOSE QUAY AT THE PORT OF GRANADILLA, ISLAND OF TENERIFE

The purpose of this project is to define and assess the works necessary for the construction of the aforementioned infrastructure, modifying the Base Project regarding the lightening of the caissons and the beam, moving from caissons with a 16.75 m beam at the shaft and a 0.25 m footing overhang to caissons with a 19.6 […]
MODIFICATIONS TO THE CONSTRUCTION PROJECT FOR THE EXPANSION OF THE PORT OF BLANES

The main modifications with respect to the Construction Project are: . Modification of the caisson cells, changing to circular cell caissons . Towing study of the caissons from Sagunto. . Modification of alignment 2, eliminating the dissipative chamber and introducing a slightly recessed double parapet An in-depth study of the overtopping phenomenon (using both physical […]
PORT OF TABARCA, ALICANTE. CONSTRUCTION PROJECT FOR URGENT INTERVENTIONS

Construction Project detailing the urgent interventions to be carried out for the proper operation of the Port of Tabarca. Maximum importance is given at all times to the environmental protection of the enclave. The interventions comprising the Construction Project are: 1.- Breakwater Repair: The protective riprap for the Tabarca Island Port breakwater is calculated. This […]
Construction design project for the extension of the breakwater quay