MODIFICATIONS TO THE CONSTRUCTION PROJECT FOR THE EXPANSION OF THE PORT OF BLANES

[bloque_categoria_proyecto]
Scope:
MODIFICATIONS TO THE CONSTRUCTION PROJECT
Location:
BLANES - GIRONA - SPAIN

The main modifications with respect to the Construction Project are: . Modification of the caisson cells, changing to circular cell caissons . Towing study of the caissons from Sagunto. . Modification of alignment 2, eliminating the dissipative chamber and introducing a slightly recessed double parapet. An in-depth study of the overtopping phenomenon (using both physical and mathematical models), its drainage, as well as the stability of the breakwater was conducted. The shapes of each of the two parapets were analyzed in great detail.

Related projects

It seems we cannot find what you are looking for.