INTAKE CAISSON FOR THE BESÓS 5 C.T.C.C. (BARCELONA, SPAIN). ADAPTATION STUDY

tomas sin conduccion 01

The intake caissons of the Besós I and Besós II C.T.C.C. were redesigned and strengthened for their new use at the Besós V C.T.C.C. Key tasks carried out included: • Hydraulic adaptation of the existing caissons to the new requirements. • Structural works: • Surveying of the current condition • Study and design calculations to […]

CONSTRUCTION PROJECT FOR GRANADILLA II PUMPING STATION. TENERIFE

tomas sin conduccion 07

Design of the water intake caisson for the Granadilla Combined Cycle Thermal Power Plant in Tenerife. The caisson is made of reinforced concrete. It has a length of 32.1 m with a beam of 10.3 m and a depth of 9.41 m. It must be stable while floating during certain phases of its construction. It […]

SLOPE AND WALL PROJECT. WEST SIDE. C. T. C. C. GRANADILLA II (TENERIFE)

otros proyectos 03

Project preparation, the purpose of which is to calculate and justify the design of the walls and slopes required to expand the plot on its West side, setting back the currently existing slope. The expansion on the West side of the plot requires the construction of different types of walls: •Wall 1 consisting of: • […]

INITIAL DILUTION STUDY OF THE DISCHARGE FROM THE CAMPO DALÍAS DESALINATION PLANT (ALMERÍA)

imagen2

Given the uncertainty regarding the behavior of the diffuser designed during the Preliminary Project and Environmental Impact Study phase, INCREA was requested to conduct a comprehensive initial dilution study (using the CORJET model) with a twofold objective: . To calculate the initial dilution in the different operating phases of the desalination plant . To calculate […]