LIQUID BULK TERMINAL AT PUERTO BAHÍA, CARTAGENA DE INDIAS, COLOMBIA. MARINE INFRASTRUCTURE AND OPERATIONS DOCK

pantalanes 02

1. Analysis of documentation and Base Project. Identification of deficiencies, ambiguities, and contradictions. Risk and opportunity assessment. Measurements. 2. Improvements to the definition of the Base solution: piled jetty with two berths for tanker vessels, with a maximum length of 275 m (Suezmax). 3. Variant Project: • Geotechnical study: ground modeling, geotechnical units, parameterization, and […]

PARACAS TERMINAL ENGINEERING, PERU

paracas1

Study and optimization of the Base Solution and drafting of the Alternative Solution to the Base Project. The following tasks are performed: • Marine Climate Study • Design of the ground embedment for the driven steel piles of the base solution and verification of the shaft resistance. • Design of the cathodic protection for the […]

PRELIMINARY DESIGN FOR THE EXPANSION OF THE NUEVA PALMIRA PORT TERMINAL (URUGUAY)

palmira

In summary, the scope of the works includes:– The construction of two new piers: • Dolphins to protect the foundations of the conveyor belts in the river section (dolphins 10 and 11). • Dredging– Installation of conveyor belts– Mineral stockpiling structures– Tunnels– Yard, urban development, and facilities.

PRELIMINARY DESIGN OF THE NEW JETTY FOR LNG REGASIFICATION PLANT

pantalanes 03

Studies for the administrative concession for the construction of a berthing pier for LNG carriers • Project vessel: Qmax •Length: 345 m •Beam: 53.8 m •Depth: 34.7 m •Maximum draft: 12.0 m •Capacity: 266,000 m3 • Preliminary design of the jetty, for which the following aspects are mainly analyzed: 1.Characterization of dredged material: sampling campaign […]

PRELIMINARY NAUTICAL STUDIES FOR LNG REGASIFICATION PLANT BERTHING JETTY

pantalanes 07

The study aims to define the following, prior to the preparation of the Construction Projects for the infrastructure: • Maneuvering and berthing study: dimensioning in plan and elevation. • Study of the passing vessel effect in the vicinity of the new jetty. The design vessel is the Q-max LNG carrier, which has the following maximum […]