PRELIMINARY DESIGN OF THE NEW JETTY FOR LNG REGASIFICATION PLANT

[bloque_categoria_proyecto]
Scope:
Studies and reports
Location:
HUELVA (SPAIN)

Studies for the administrative concession for the construction of a berthing pier for LNG carriers
• Project vessel: Qmax

•Length: 345 m
•Beam: 53.8 m
•Depth: 34.7 m

•Maximum draft: 12.0 m
•Capacity: 266,000 m3

• Preliminary design of the jetty, for which the following aspects are mainly analyzed:

1.Characterization of dredged material: sampling campaign and laboratory analysis
2.Study of facilities for the reception of cargo residues and vessel waste
3.Study of pipeline and conduit interference with existing roads