Simple Cycle Thermoelectric Power Plant. Gran Mariscal Industrial Complex. Ayacucho (Güiria – Venezuela). Equipment Unloading Wharf and Protective Breakwater

1.Study of alternatives on site 2.Equipment unloading wharf • Buque tipo: L = 77 m; B = 15 m; Dmáx = 2,50 m • Bow unloading by gondola (L = 40 m + tractor unit on land). Maximum equipment weight: 240 t • Wharf: • Temporary (Service life: 3 years) • Typology: mass precast concrete […]
TENDER PROJECT FOR THE CONSTRUCTION OF THE OIL TERMINAL AT HAMRIYAH PORT (UNITED ARAB EMIRATES)

This is a new berthing jetty at Hamriyah Port capable of receiving vessels of 60,000 tonnes. The new jetty must meet the functional requirements and design criteria established by TAKREER for the terminal. The design includes and provides for the construction of a jetty consisting of the following main elements: • Landside access for pipelines, […]
PILE OPTIMISATION FOR CRUISE TERMINALS IN THE BOTAFoc EXPANSION WORKS. IBIZA (SPAIN)

Following the award of the works, the design and optimisation of the piles is undertaken, both for the two transverse piers and for the breasting dolphins, based on the information obtained from the new geotechnical investigation campaign: • The results of the campaign are analysed in order to establish calculation parameters for the piles: end-bearing […]
TENDER PROJECT FOR A BERTHING VARIANT FOR LARGE VESSELS AT THE WESTERN QUAYS. PALMA DE MALLORCA (SPAIN)

Drafting of the Tender Project for the Variant, addressing the following elements: • Adaptation of the internal geometry of the caissons. Optimisation of concrete and fill volumes. • New gravity structural solution at the alignment change. A more solid, durable and robust solution, as well as more flexible to absorb possible differential settlements. • Improvements […]
Marine civil works for the Repsol crude oil discharge jetty in the Outer Port of Langosteira