HYDROCARBON TRANSFER TERMINAL PROJECT IN MONTEVIDEO BAY. PART II. BERTHS AND RECLAIMED AREA

[bloque_categoria_proyecto]
Scope:
Drafting of the Basic Project
Location:
Montevideo (URUGUAY)

1. Structure of the piled maritime terminal and dredging of its basin.
• Operations platform (51 x 20 m)
• 4 dolphins (berthing dolphins)
• 2 mooring towers (mooring dolphins)
• Connecting walkways
• 75 reinforced concrete piles, D=1,200 mm

2. Rubble mound breakwater for the protection of the Maritime Terminal, extension of an existing one.
• L ≈ 350 m
• Protection with 5 and 8 t Cubipods.

3. Expansion of the reclaimed area for the construction of new facilities
• New reclaimed area of ≈ 9.5 ha.
• Perimeter containment bund (L ≈ 880 m)
• Block wharf (loading dock): · L≈60 m · Depth = 8.5 m · Draft = 4 m