VARIANT PROJECT FOR A NEW BREASTING DOLPHIN AT MUELLE DE RIBERA I | PORT OF CARBONERAS

carboneras1

Drafting of the Tender Project, adapting the Base Solution to the contractor’s resources, changing from square-cell caissons to circular ones and from two caissons to a single caisson 51.8 m in length. The structure has the same orientation as the existing Muelle de Ribera I, spaced 88 m apart (between fenders).The structure is defined as […]

VARIANT PROJECT FOR A NEW CONTAINER TERMINAL PHASE I. CÁDIZ, SPAIN

muelles 01

This involves the preparation of the Variant Solution to the Base Project. The work consists of advancing the berthing front of the North Poniente Wharf, extending the berthing front of the current Poniente Wharf Expansion and ending with a Ro-Ro heel against the Second Extension of the Poniente Wharf. The following works are carried out […]

TENDER PROJECT FOR WHARF NO. 9 AT RAOS IN THE PORT OF SANTANDER (SPAIN)

muelles 09

The Variant Tender Project is drafted to adapt the definition of the works to the available circular-cell formwork. The main characteristics of the wharf are: • Wharf length: 291 m • Draft: 18.25 m • Six caissons Additionally, it will be necessary to carry out ground improvement where the wharf will be founded, as well […]

TENDER PROJECT FOR MUELLE DE RIBERA I AT THE PORT OF CARBONERAS. ALMERÍA (SPAIN)

muelles 12

Variant Tender Project for adapting the caissons to the contractor’s formwork and designing the works required for the construction of a Ribera Wharf with a draft of 18.00 metres and a length of approximately 246 metres. The main characteristics of the wharf are: • Wharf length: 246 m • Draft: 18 m • Five caissons […]