PRELIMINARY DESIGN FOR THE EXTENSION OF THE PESCANOVA QUAY IN CHAPELA, REDONDELA. PONTEVEDRA (SPAIN)

The purpose of the preliminary design is to define the extension of the Pescanova quay in Chapela. The quay will be 90 m long and 9.5 m wide, and to prevent wave reflections in the area it is designed on piles. To carry out the works, the following process is proposed: • Installation of the […]
CONSTRUCTION VARIANT PROJECT FOR MULTIPURPOSE TERMINAL NO. 2 AT THE WEST QUAY OF THE SOUTH BASIN OF THE SAGUNTO PORT EXPANSION. VALENCIA (SPAIN)

MARITIME ZONE project: located in the South Basin of the Port of Sagunto. The works consist of: • 502.92-meter quay • Adjacent service esplanade, 120,000 m2 • Ro-Ro ramp at the confluence of both alignments. • First caisson of the future North Quay alignment.
TENDER VARIANT PROJECT FOR THE NORTHEAST QUAY OF THE SAGUNTO PORT EXPANSION. VALENCIA (SPAIN)

The works defined in this Project consist of: • Northeast Quay, consisting of 10 caissons. • Tugboat Quay, consisting of 4 caissons. • Submerged concrete quay: part of the enclosure for the containment of the esplanade. • Containment dike: the other enclosure element for the containment of the esplanade. • Service esplanade. • Pre-loading. • […]
BASIC PROJECT FOR THE ESPLANADE AND COMMERCIAL QUAYS SHELTERED BY THE BOTAFOC BREAKWATER IN THE PORT OF IBIZA. BALEARIC ISLANDS (SPAIN)

Basic Project for commercial quays sheltered by the Botafoc Breakwater, consisting of: • Longitudinal quay and esplanade, on the shore of Isla Plana, consisting of 3 types of caissons anchored at levels -14, -10.6 and 7.8. • Transverse quays: two piled quays to reduce wave agitation in the basin.
OPTIMIZATION OF THE REINFORCEMENT OF THE TYPICAL CAISSON FOR THE QUAY ATTACHED TO THE ALGORTA BREAKWATER, BILBAO

Optimization of the reinforcement of the typical caisson for the Project using two distinct methodologies: • Traditional method, based on structural simplifications for stress calculation. Reinforcement calculation is performed according to EHE 08 and the Caisson Manual. • Method based on finite element programs (FEM). Modeling with 3D Structural Analysis Software.Additionally, the naval stability of […]
GEOTECHNICAL AND STRUCTURAL STUDIES AT RIBERA II QUAY. PORT OF CARBONERAS (ALMERÍA)

Safety assessment of the Ribera II loading jetty “as built”, under the new equipment: . Geotechnical failure modes: stability calculations (sliding, overturning, settlement and global stability). . Structural failure modes: deck, piles and bearings. . SAP2000 modelling of the deck. . Detailed study of the grade line between the precast beams and the slab . […]
ENGINEERING FOR THE LEVANTE BERTH OF THE PASSENGER WHARF AT THE PORT OF MAHÓN, ISLAND OF MENORCA

Structural study of the Levante passenger wharf at the port of Mahón for the slab solution consisting of precast slabs plus cast-in-place concrete.The main characteristics of the wharf: . Approximate length of 64 m and maximum width of 25 m. . Foundation using piles of 1.5 m diameter. . Transverse beams spaced every 6 m. […]
PRELIMINARY DESIGN OF THE NEW JETTY FOR LNG REGASIFICATION PLANT

Studies for the administrative concession for the construction of a berthing pier for LNG carriers • Project vessel: Qmax •Length: 345 m •Beam: 53.8 m •Depth: 34.7 m •Maximum draft: 12.0 m •Capacity: 266,000 m3 • Preliminary design of the jetty, for which the following aspects are mainly analyzed: 1.Characterization of dredged material: sampling campaign […]
PRELIMINARY NAUTICAL STUDIES FOR LNG REGASIFICATION PLANT BERTHING JETTY

The study aims to define the following, prior to the preparation of the Construction Projects for the infrastructure: • Maneuvering and berthing study: dimensioning in plan and elevation. • Study of the passing vessel effect in the vicinity of the new jetty. The design vessel is the Q-max LNG carrier, which has the following maximum […]
PILE OPTIMISATION FOR CRUISE TERMINALS IN THE BOTAFoc EXPANSION WORKS. IBIZA (SPAIN)

Following the award of the works, the design and optimisation of the piles is undertaken, both for the two transverse piers and for the breasting dolphins, based on the information obtained from the new geotechnical investigation campaign: • The results of the campaign are analysed in order to establish calculation parameters for the piles: end-bearing […]