OPTIMIZATION OF THE REINFORCEMENT OF THE TYPICAL CAISSON FOR THE QUAY ATTACHED TO THE ALGORTA BREAKWATER, BILBAO

mal imagen1

Optimization of the reinforcement of the typical caisson for the Project using two distinct methodologies: • Traditional method, based on structural simplifications for stress calculation. Reinforcement calculation is performed according to EHE 08 and the Caisson Manual. • Method based on finite element programs (FEM). Modeling with 3D Structural Analysis Software.Additionally, the naval stability of […]

GEOTECHNICAL AND STRUCTURAL STUDIES AT RIBERA II QUAY. PORT OF CARBONERAS (ALMERÍA)

emuca imagen1

Safety assessment of the Ribera II loading jetty “as built”, under the new equipment: . Geotechnical failure modes: stability calculations (sliding, overturning, settlement and global stability). . Structural failure modes: deck, piles and bearings. . SAP2000 modelling of the deck. . Detailed study of the grade line between the precast beams and the slab . […]

PRELIMINARY DESIGN OF THE NEW JETTY FOR LNG REGASIFICATION PLANT

pantalanes 03

Studies for the administrative concession for the construction of a berthing pier for LNG carriers • Project vessel: Qmax •Length: 345 m •Beam: 53.8 m •Depth: 34.7 m •Maximum draft: 12.0 m •Capacity: 266,000 m3 • Preliminary design of the jetty, for which the following aspects are mainly analyzed: 1.Characterization of dredged material: sampling campaign […]

PRELIMINARY NAUTICAL STUDIES FOR LNG REGASIFICATION PLANT BERTHING JETTY

pantalanes 07

The study aims to define the following, prior to the preparation of the Construction Projects for the infrastructure: • Maneuvering and berthing study: dimensioning in plan and elevation. • Study of the passing vessel effect in the vicinity of the new jetty. The design vessel is the Q-max LNG carrier, which has the following maximum […]

PILE OPTIMISATION FOR CRUISE TERMINALS IN THE BOTAFoc EXPANSION WORKS. IBIZA (SPAIN)

pantalanes 16

Following the award of the works, the design and optimisation of the piles is undertaken, both for the two transverse piers and for the breasting dolphins, based on the information obtained from the new geotechnical investigation campaign: • The results of the campaign are analysed in order to establish calculation parameters for the piles: end-bearing […]