INTAKE AND DISCHARGE PIPELINES FOR THE LA JOVITA CCC, BAJA CALIFORNIA (MEXICO)

Development of 3 alternatives for the intake (2) and discharge (2) of seawater for the cooling circuit of a new CCC. • Qd = 29735 m3/h, for both intake and discharge. • Selection of intake and discharge points. • Hydraulic calculations and preliminary design of structures • ALTERNATIVES: 1. TRENCH. 2. PIPE JACKING, complemented with […]
DILUTION AND DISPERSION STUDY OF THE BRINE DISCHARGE FROM THE CALDERA DESALINATION PLANT, CHILE

An initial dilution study (to define the diffuser section), dispersion, and recirculation of the brine discharge from the new desalination plant is carried out.The study will form part of the Environmental Impact Assessment for the new desalination plant.The discharge characteristics are: • Flow rate: 1.47 m3/s • Effluent salinity: 65.3 g/L • Effluent temperature: 13°C […]
SUBMARINE PIPELINES FOR THE AL-GHUBRAH DESALINATION PLANT (OMAN). CONSTRUCTION PROJECT

The purpose of this project is to define and justify the marine works for the desalination plant, including the seawater intake and the brine discharge system. The pipeline characteristics are: • Material: PE100. • Pipeline definition: Intake 2xØi=1,700 mm SDR 26 and discharge 1xØi=1,900 mm SDR 26 • Length: 1,125 m discharge and 1,600 m […]
ARRASTRE POR FONDO DE LA CONDUCCIÓN DE VERTIDO DE LA PLANTA DE TRATAMIENTO DE LA CHIRA, PERÚ

Design of the installation using off-bottom pull (off-bottom pull) with chain support • The pipeline characteristics are: • Discharge flow rate: 11.3 m3/s • Internal diameter: 2,400 mm • Maximum depth: 60 m • Length: 3,627 m Numerous tasks are carried out in connection with defining the off-bottom pull construction process: • Current study (magnitude […]
MARINE CLIMATE AND OUTFALL DISPERSION (DILUTION) STUDY FOR THE LUANDA SUBMARINE OUTFALL (ANGOLA). DETAILED ENGINEERING

In support of the Basic Project, detailed engineering is carried out to study the following aspects of the project using mathematical models: • Marine climate study. Based on data from the Wavewatch II model used by NOAA, a wave record is obtained and propagated to the works area using the SMC model. These data form […]
OUTFALL PIPELINE OF LA CHIRA TREATMENT PLANT (PERU). CONSTRUCTION PROJECT

Various detailed engineering tasks for the Outfall Pipeline Construction Project. The pipeline characteristics are: • Discharge flow rate: 11.3 m3/s • Internal diameter: 2,400 mm • Maximum depth: 60 m • Length: 3,627 m Numerous complementary works are carried out for the Project: • Design of seabed anchoring by bottom dragging with chain support. • […]
SUBMARINE PIPELINES FOR SANITATION IN THE SOUTHERN DISTRICTS OF LIMA (PERU)

The project involves the design of the submarine pipelines for the future desalination and wastewater treatment plant serving the districts of Punta Hermosa, Punta Negra, San Bartolo and Santa María, including the intake structure and the diffuser section.The pipeline characteristics are: • Material: PE100. • Pipeline definition: intake Øe=1200 mm. Discharge Øe=900 mm supported on […]
OFFSHORE PIPELINES FOR PETROLEUM PRODUCTS IN SALINETAS, GRAN CANARIA, SPAIN.

– 2 metallic offshore pipelines for transporting petroleum products: •Nominal diameter = 16” (14” alternative) •Length = 500 m (each) •Three-layer and concrete coating– Concrete ballast, continuous and at joints.– Auxiliary construction structures: •Auxiliary sloped breakwater •Launch ramp– Construction phases and methodologies: off-bottom pulling– Technical specifications– Measurements
SUBSEA PIPELINES FOR THE MANTOVERDE DESALINATION PLANT (CHILE), DETAILED DESIGN

The project includes the detailed design of the desalination plant’s subsea pipelines, including the intake structure and the diffuser section. The pipeline characteristics are: • Material: PE100. • Pipeline specification: intake Øe=800 mm SDR 26 and discharge Øe=560 mm SDR 26 • Length: 709 m discharge and 510 m intake • Maximum flow rates: intake: […]
SUBMARINE PIPELINES FOR THE NUNGUA DESALINATION PLANT (REPUBLIC OF GHANA), CONSTRUCTION PROJECT

The Project includes the construction design of the submarine pipelines for the desalination plant, including the intake structure and the diffuser section. The pipeline characteristics are: • Material: PE100. • Pipeline specifications: intake Øe=1200 mm SDR 26 and discharge Øe=900 mm SDR 33 • Length: 150 m discharge and 450 m intake • Maximum flow […]