CONSTRUCTION PROJECT FOR GRANADILLA II PUMPING STATION. TENERIFE

tomas sin conduccion 07

Design of the water intake caisson for the Granadilla Combined Cycle Thermal Power Plant in Tenerife. The caisson is made of reinforced concrete. It has a length of 32.1 m with a beam of 10.3 m and a depth of 9.41 m. It must be stable while floating during certain phases of its construction. It […]

DISCHARGE PIPELINE FOR THE QINGDAO DESALINATION PLANT (CHINA)

conducciones submarinas 57

The construction project for the submarine outfall of the Qingdao desalination plant is carried out. The project includes studies on trench burial, coastal dynamics, and beach profile evolution. The project also includes advisory services for potential pipeline suppliers in China. A study is also conducted on the different types of maritime signaling that can be […]

OUTFALL PIPELINE FOR THE ÁGUILAS DESALINATION PLANT (MURCIA)

conducciones submarinas 59

The hydraulic and structural design of the pipeline is carried out, including anchoring and the analysis of the required ballast. The ballast is optimized in 6 sections, and its reinforcement is calculated. • Outside diameter: 1,400 mm • Length: 879 m • No. of diffusers: 24 • Spacing between diffusers: 8 m • Maximum depth: […]

DEPLOYMENT OF THE XAGÓ OUTFALL, AVILÉS

conducciones submarinas 61

A study is conducted on the deployment of the Xagó outfall, preventing tension during the connection at the seabed. For this purpose, balloons are used in the initial phase of the deployment. Additionally, the water and air inlet valves are calculated, along with the definition of the tanks that will act as floats. The beach […]

SUBMARINE PIPELINES FOR THE KUNKÖY DESALINATION PLANT (CYPRUS)

conducciones submarinas 63

The characteristics are: • Material: GRP • Intake pipeline: The intake pipeline will have an internal diameter of 1,000 mm, PN 1. The pipeline length is 927 m. The flow rate is 0.66 m³/s • Discharge pipeline: It has an internal diameter of 700 mm, PN 1. It will have a length of 3,767 m […]

SUBSEA PIPELINES FOR THE CAP D’JINET DESALINATION PLANT (ALGERIA)

conducciones submarinas 65

Following the preliminary environmental and marine climate studies carried out by the UTE, the sizing and design of the desalination plant’s subsea pipelines are undertaken. In addition, the diffuser section and the intake tower are designed to ensure optimal operation. The pipeline characteristics are: • Material: PE100. • Internal diameter: • Intake: 1,800 mm • […]

SUBMARINE PIPELINES FOR THE CHENNAI DESALINATION PLANT (INDIA)

conducciones submarinas 67

The characteristics are: • Material: PE-100 • Intake pipeline: The intake pipeline will have an outside diameter of 1,600 mm, SDR-26. The pipeline length is 1,000 m, with an intake depth of 10 m. The flow rate is 3.07 m3/s • Outfall pipeline: The outfall pipeline will have an outside diameter of 1,200 mm, with […]

SUBMARINE PIPELINES FOR THE DJERBA DESALINATION PLANT (TUNISIA)

conducciones submarinas 70

The submarine pipeline section of the tender project for the concession of a desalination plant on the Tunisian coast is drafted. The land pipelines are constructed in GRP and the marine pipelines in PE-100. The project is divided into three pipelines: • Intake pipeline: runs from the intake tower to the pumping station. It consists […]