NEW SEAWATER INTAKE CAISSON IN RUWAIS (ABU DHABI, UNITED ARAB EMIRATES)

tomas sin conduccion 02

Basic design of a new seawater intake caisson at the Ruwais industrial complex. The new intake caisson, Sea Water Intake 3 (SWI-3), is located between the two existing ones (SWI-1 and SWI-2). Key activities include: Location and study of layout alternatives to ensure no interference with the operation of existing SWI-1 and SWI-2. • Study […]

SUBMARINE PIPELINES FOR THE HONAINE DESALINATION PLANT, ALGERIA. VALIDATION REPORT FOR THE PIPELINES PROPOSED FOR THE PROJECT

conducciones submarinas 105

Technical report for the validation of the pipelines proposed by PPA&KRAH, dividing into sections to optimize the pipeline according to structural requirements. Additionally, a beach profile study is conducted to analyze the profile evolution under design storm conditions, examining the possibility of removing the protective concrete and maximum soil loads. The pipeline characteristics are: •Seawater […]

AUXILIARY WORKS FOR THE LAUNCHING OF THE SUBMARINE PIPELINES OF THE HONAINE DESALINATION PLANT

conducciones submarinas 107

Construction Project for auxiliary facilities for the launching and storage of the submarine pipelines of the Honaine desalination plant. The desalination plant pipelines have the following characteristics •Seawater intake pipeline made of PE80 – Internal diameter: 2,400 mm – Length: 900 m •Brine Discharge Pipeline in PE80 – Internal diameter: 1,500 mm – Length: 460 […]

INITIAL DILUTION STUDY OF THE DISCHARGE FROM THE CAMPO DALÍAS DESALINATION PLANT (ALMERÍA)

imagen2

Given the uncertainty regarding the behavior of the diffuser designed during the Preliminary Project and Environmental Impact Study phase, INCREA was requested to conduct a comprehensive initial dilution study (using the CORJET model) with a twofold objective: . To calculate the initial dilution in the different operating phases of the desalination plant . To calculate […]

SHUWEIHAT S-4 REVERSE OSMOSIS DESALINATION PLANT (ABU DHABI, UNITED ARAB EMIRATES)

shuwe 2223 imagen1

The engineering works for this new S4-RO plant, with a capacity of 70 MGID, included extending the existing intake channel to the project plot, constructing the pumping station, and a discharge system comprising two onshore GRP pipelines with a 1,600 mm internal diameter and a manhole that discharges brine into the existing outfall channel via […]

INTAKE CAISSON FOR THE BESÓS 5 C.T.C.C. (BARCELONA, SPAIN). ADAPTATION STUDY

tomas sin conduccion 01

The intake caissons of the Besós I and Besós II C.T.C.C. were redesigned and strengthened for their new use at the Besós V C.T.C.C. Key tasks carried out included: • Hydraulic adaptation of the existing caissons to the new requirements. • Structural works: • Surveying of the current condition • Study and design calculations to […]