INITIAL DILUTION STUDY OF THE DISCHARGE FROM THE CAMPO DALÍAS DESALINATION PLANT (ALMERÍA)

Given the uncertainty regarding the behavior of the diffuser designed during the Preliminary Project and Environmental Impact Study phase, INCREA was requested to conduct a comprehensive initial dilution study (using the CORJET model) with a twofold objective: . To calculate the initial dilution in the different operating phases of the desalination plant . To calculate […]
AUXILIARY WORKS FOR THE LAUNCHING OF THE SUBMARINE PIPELINES OF THE HONAINE DESALINATION PLANT

Construction Project for auxiliary facilities for the launching and storage of the submarine pipelines of the Honaine desalination plant. The desalination plant pipelines have the following characteristics •Seawater intake pipeline made of PE80 – Internal diameter: 2,400 mm – Length: 900 m •Brine Discharge Pipeline in PE80 – Internal diameter: 1,500 mm – Length: 460 […]
SHUWEIHAT S-4 REVERSE OSMOSIS DESALINATION PLANT (ABU DHABI, UNITED ARAB EMIRATES)

The engineering works for this new S4-RO plant, with a capacity of 70 MGID, included extending the existing intake channel to the project plot, constructing the pumping station, and a discharge system comprising two onshore GRP pipelines with a 1,600 mm internal diameter and a manhole that discharges brine into the existing outfall channel via […]
SEAWATER INTAKE PIPELINE FOR THE ARZEW CHEMICAL PLANT (ALGERIA)

Construction Project for the new seawater intake of the Arzew chemical plant. The projected facilities consist of: • Intake tower. • Submarine pipeline. The new seawater intake pipeline is designed in PE100 with the following characteristics: • Internal diameter: 2,400 mm • Length: 466 m • Flow rate: 8.9 m³/s
UNDERWATER PIPELINES AND PUMPING MAIN FOR THE BENI-SAF DESALINATION PLANT, ALGERIA. DESIGN OF THE CONSTRUCTION PROJECT

Construction Project for the underwater pipelines of the Beni-Saf Desalination Plant (IDAM), encompassing the following: •PE80 Seawater Intake Pipeline.. • Internal diameter: 2,400 mm • Length: 1,200 m • Maximum flow rate: 5 m³/s • Depth: 18 m •PE80 Brine Discharge Pipeline. • Internal diameter: 1,800 mm • Length: 1,574 m • Maximum flow rate: […]
VALDELENTISCO DESALINATION PLANT PIPELINES, CARTAGENA, MURCIA. STUDY OF CONSTRUCTION PROCESSES FOR THE

Studies conducted on the PPA&KRAH pipelines for the design of their sinking process and verification of their behavior during the same. The sinking by means of floats of the brine discharge outfall and intake pipeline is analyzed, with the pipelines studied having an internal diameter of 1,800 mm (intake) and 1,500 mm (discharge). The process […]
AUXILIARY FACILITIES FOR THE LAUNCHING OF MEGA-PIPELINES IN BENI-SAF, ALGERIA. CONSTRUCTION PROJECT

Construction Project for the auxiliary facilities for the launching and stockpiling of underwater pipelines in Beni-Saf. The facilities consist of: • Launching ramp with Teflon. • Deep sheet-piled trench. • Pedestrian walkway over the trench for resident access. The pipelines are: • PE80 seawater intake pipeline. • Internal diameter: 2,400 mm • Length: 1,200 m […]
RELOCATION OF THE SUBMARINE OUTFALL FOR THE MANCOMUNIDAD DEL SURESTE, GRAN CANARIA

Drafting of the modified project, proposing a change in the pipeline route, which will run along the current pier, reaching the sea through a shaft created in a cell of one of the breakwater caissons. It consists of: • LAND section: • PE 100 pipe • Length 1,047 m • Outer diameter 900 mm • […]
OFFSHORE PIPELINES FOR THE STORMWATER OUTFALLS OF THE CITY OF CÁDIZ, SPAIN

Study of the offshore pipelines for Cádiz’s stormwater outfalls, with the aim of optimizing and adapting the project calculations. The ballast design and anchoring process are analyzed, and the ballast weight and pipe wall thickness are optimized. In addition, the launch process via a ramp and the stockpiling of the pipes until transport to the […]
SUBMARINE PIPELINES FOR THE ALGECIRAS THERMAL POWER PLANT, CÁDIZ

Dredging authorization project for the construction of the cooling water intake and outfall pipelines for the Bahía de Algeciras Combined Cycle Power Plant Project. Advisory, consultancy, and design tasks were carried out, defining materials (GRP), typical sections, construction methodology, estimation of dredging volumes, and management of dredged material, among others. Two INTAKE pipelines: • Diameter: […]