INITIAL DILUTION STUDY OF THE DISCHARGE FROM THE CAMPO DALÍAS DESALINATION PLANT (ALMERÍA)

imagen2

Given the uncertainty regarding the behavior of the diffuser designed during the Preliminary Project and Environmental Impact Study phase, INCREA was requested to conduct a comprehensive initial dilution study (using the CORJET model) with a twofold objective: . To calculate the initial dilution in the different operating phases of the desalination plant . To calculate […]

AUXILIARY WORKS FOR THE LAUNCHING OF THE SUBMARINE PIPELINES OF THE HONAINE DESALINATION PLANT

conducciones submarinas 107

Construction Project for auxiliary facilities for the launching and storage of the submarine pipelines of the Honaine desalination plant. The desalination plant pipelines have the following characteristics •Seawater intake pipeline made of PE80 – Internal diameter: 2,400 mm – Length: 900 m •Brine Discharge Pipeline in PE80 – Internal diameter: 1,500 mm – Length: 460 […]

SHUWEIHAT S-4 REVERSE OSMOSIS DESALINATION PLANT (ABU DHABI, UNITED ARAB EMIRATES)

shuwe 2223 imagen1

The engineering works for this new S4-RO plant, with a capacity of 70 MGID, included extending the existing intake channel to the project plot, constructing the pumping station, and a discharge system comprising two onshore GRP pipelines with a 1,600 mm internal diameter and a manhole that discharges brine into the existing outfall channel via […]

SEAWATER INTAKE PIPELINE FOR THE ARZEW CHEMICAL PLANT (ALGERIA)

conducciones submarinas 81

Construction Project for the new seawater intake of the Arzew chemical plant. The projected facilities consist of: • Intake tower. • Submarine pipeline. The new seawater intake pipeline is designed in PE100 with the following characteristics: • Internal diameter: 2,400 mm • Length: 466 m • Flow rate: 8.9 m³/s

OFFSHORE PIPELINES FOR THE STORMWATER OUTFALLS OF THE CITY OF CÁDIZ, SPAIN

conducciones submarinas 91

Study of the offshore pipelines for Cádiz’s stormwater outfalls, with the aim of optimizing and adapting the project calculations. The ballast design and anchoring process are analyzed, and the ballast weight and pipe wall thickness are optimized. In addition, the launch process via a ramp and the stockpiling of the pipes until transport to the […]

SUBMARINE PIPELINES FOR THE ALGECIRAS THERMAL POWER PLANT, CÁDIZ

conducciones submarinas 89

Dredging authorization project for the construction of the cooling water intake and outfall pipelines for the Bahía de Algeciras Combined Cycle Power Plant Project. Advisory, consultancy, and design tasks were carried out, defining materials (GRP), typical sections, construction methodology, estimation of dredging volumes, and management of dredged material, among others. Two INTAKE pipelines: • Diameter: […]