CONSTRUCTION PROJECT FOR THE EXTENSION OF THE PESCANOVA QUAY IN CHAPELA, REDONDELA, PONTEVEDRA (SPAIN)

The project aims to define the extension of the Pescanova Quay in Chapela. The quay will be attached to the existing one, which will be extended using piles. The characteristics are: • Circular piles with an external diameter of 1.0416 m • 30 t bollards • Quay length: 90.05 m • Quay draft: 6.50 m […]
VARIANT PROJECT FOR A NEW CONTAINER TERMINAL PHASE I. CÁDIZ, SPAIN

This involves the preparation of the Variant Solution to the Base Project. The work consists of advancing the berthing front of the North Poniente Wharf, extending the berthing front of the current Poniente Wharf Expansion and ending with a Ro-Ro heel against the Second Extension of the Poniente Wharf. The following works are carried out […]
EXTENSION OF THE FIRST BERTHING LINE FOR LARGE VESSELS AT THE COMMERCIAL QUAYS SHELTERED BY THE BOTAFoc BREAKWATER

Extension of Transversal Wharf 2 to reach a total berthing length of 375 m on the south side and 328 m on the north side to serve Ro/Ro vessels and large cruise ships by means of 3 piled breasting dolphins:1.Breasting dolphins 1 and 2• Reinforced concrete deck: 17.80 x 28.70 x 2.20 m• 16 reinforced […]
VARIANT PROJECT FOR A NEW BREASTING DOLPHIN AT MUELLE DE RIBERA I | PORT OF CARBONERAS

Drafting of the Tender Project, adapting the Base Solution to the contractor’s resources, changing from square-cell caissons to circular ones and from two caissons to a single caisson 51.8 m in length. The structure has the same orientation as the existing Muelle de Ribera I, spaced 88 m apart (between fenders).The structure is defined as […]
STRUCTURAL RECALCULATION IN THE TENDER PHASE FOR THE PROJECT FOR THE EXTENSION OF THE NORTH WHARF OF THE INNER BASIN OF CAMPAMENTO, SAN ROQUE

A report is prepared to support the contractor during the tender phase. To this end, structural recalculation is carried out in accordance with the provisions set out in the Particular Conditions for the Contracting of the Works.The greatest efforts focus on the most sensitive design elements: transition beams between caissons, geotechnical stability of the structures, […]
PRELIMINARY DESIGN FOR A LIQUID BULK TERMINAL WHARF AT THE PORT OF BILBAO

This involves the preparation of a basic preliminary design for a liquid bulk terminal wharf at the Port of Bilbao. The following works have been carried out:• Alternatives study• Wharf with yard• Jetty-type wharf• Design of mooring and berthing elements
TENDER PROJECT FOR THE REHABILITATION OF MUELLE DEL PRAT AT THE PORT OF BARCELONA (SPAIN)

Project defining the rehabilitation of the complete wharf, maximizing the use of damaged caissons. Two infill zones will be constructed. A detailed inspection would be carried out to determine the condition of the caissons and assess the degree of possible reuse. A detailed infographic was created to explain the refloating process.
TECHNICAL ASSISTANCE FOR THE STABILITY REVIEW OF QUAYS 2 AND 3 IN ACCORDANCE WITH ROM 2.0. 0- 11

Design review of quays 2 and 3 sheltered by the La Esfinge breakwater in accordance with the new ROM 2.0-11 and redesign of the caissons and sections.The main characteristics of the quays are: • Caissons with a depth of 13 and 17 m and a beam of 9 and 14.5 m. • Drafts of 10 […]
VARIANT PROJECT FOR THE SECOND SECTION OF THE MULTIPURPOSE QUAY AT THE PORT OF GRANADILLA, ISLAND OF TENERIFE

The purpose of this project is to define and assess the works necessary for the construction of the aforementioned infrastructure, modifying the Base Project regarding the lightening of the caissons and the beam, moving from caissons with a 16.75 m beam at the shaft and a 0.25 m footing overhang to caissons with a 19.6 […]
VARIANT PROJECT FOR THE EXPANSION OF THE ESPLANADE AT THE NORTH PONIENTE WHARF OF THE PORT OF PALMA

This involves the preparation of the Variant Solution to the Base Project. The work consists of advancing the berthing front of the North Poniente Wharf, extending the berthing front of the current Poniente Wharf Expansion and ending with a Ro-Ro heel against the Second Extension of the Poniente Wharf. The following works are carried out […]