ALTERNATIVE DESIGN PROJECT FOR THE EXTENSION OF THE ATTACHED QUAY 2ND PHASE B (MULTIPURPOSE TERMINAL) PALMA DE MALLORCA

The works under this project are intended to extend the 2nd alignment of the Attached Quay to create an additional 290 m berthing line with a 16.00 m draft, planned in the short to medium term for the expansion of the adjacent container terminal, and in the medium to long term to allow, where applicable, […]
CONSTRUCTION PROJECT FOR THE NORTH EXTENSION OF THE SOUTH WHARF, HUELVA

Extension of the South Wharf by a length of 525 m to enable the berthing of container vessels of 6,400 and 9,000 TEU by means of a sheet pile wall wharf. The characteristics of the extended wharf are: • Crown elevation: +6.50 m • Design dredging elevation: -17.0 m • 2 standard sectionsThe following main […]
PROJECT TO ADAPT THE RAÍCES QUAY TO NEW TRAFFIC

The draft at the Raíces Quay is increased from the current 8.7 m to 14 m by extending the quay.Dredging is carried out on Category C contaminated material, so after an alternatives study, the sheet pile solution is selected.Environmental protection of the surroundings is of vital importance, as the works are located in NATURA 2000 […]