OUTFALL PIPELINE FOR THE PUNTA PEREIRA PULP AND POWER PLANT (URUGUAY)

conducciones submarinas 76

Preliminary design of the Punta Pereira pulp mill outfall pipeline (Uruguay). It is part of the complete Pulp Mill Project, constituting one of its chapters. The pipeline characteristics are: • OD=1,400 mm • PE-80 SDR 33 pipe • Q=2m³/s • Length of 1,880 m The following aspects of the pipeline are studied: • Diffuser design […]

HYDROCARBON TRANSFER TERMINAL IN MONTEVIDEO BAY. PART I. CONCRETE-COATED STEEL PIPELINES

terminal hidrocarburos arrastre por fondo bottom pull

Definition and design of subsea pipelines for transporting hydrocarbons from the Marine Terminal to the onshore Refinery. Four X46 steel pipelines with concrete coating for ballast were designed. • 24″ steel pipeline (fuel oil and, exceptionally, crude oil). • 20″ steel pipeline (gas oil). • 20″ steel pipeline (gasolines and LPG). • 8″ “service” steel […]

PUNTA YEGUAS OUTFALL, MONTEVIDEO (URUGUAY)

montevideo uruguay imagen1

The purpose of this project is to define and justify the terrestrial and aquatic sections of the wastewater outfall.The pipeline characteristics are:• Material: Terrestrial section: GRP and Aquatic section: HDPE.• Pipe definition: Terrestrial section Øi=1,700 mm and Aquatic section Øe=1,600 mm• Length: 331 m terrestrial section and 2,107 m aquatic section• Maximum flow rate: 5.35 […]

PRELIMINARY DESIGN FOR THE EXPANSION OF THE NUEVA PALMIRA PORT TERMINAL (URUGUAY)

palmira

In summary, the scope of the works includes:– The construction of two new piers: • Dolphins to protect the foundations of the conveyor belts in the river section (dolphins 10 and 11). • Dredging– Installation of conveyor belts– Mineral stockpiling structures– Tunnels– Yard, urban development, and facilities.