Scope:
Construction Project
Location:
Colonia (Uruguay)

The project involves the construction design of the treatment plant’s underwater pipeline, including a temporary dike. The characteristics of the pipeline are: • Material: PE100. • Discharge pipe Øe=500 mm SDR 33 • Length: 300 m • Maximum flow rate: 225 l/s A detailed study of the following aspects has been carried out: • Temporary dike in the surf zone, 150 m in length. • Sinking and positioning process. • Ballast study for river currents. • Hydraulic study including transient processes and pipeline cleaning via flushing.