CONSTRUCTION PROCESSES AND DESIGN ALTERNATIVES FOR THE SKIKDA PIPELINES, ALGERIA. DETAILED STUDY

[bloque_categoria_proyecto]
Scope:
Construction Project
Location:
SKIKDA, ALGERIA

Study of the feasibility of changing the longitudinal profile, placing the pipelines on the seabed and subsequently protecting them with riprap. This reduced the volume of trench to be excavated.
The following aspects were calculated, using the oceanographic parameters of the Construction Project:
– Pipeline protection with riprap and filters
– Required pipeline rigidity with the new protection

Additionally, a detailed study of the pipeline launching ramp into the sea was conducted.