DETAILED MARINE WORK DESIGN FOR LA JOIE DE HICHA DESALINATION PLANT (TUNISIA)

[bloque_categoria_proyecto]
Scope:
Construction Project
Location:
Tunis (Tunisia)
Año:2025

Both intake and outfall pipelines are laid in trenches.

Main characteristics of the project. :

  • Material: HDPE100
  • Pipelines: Intake: OD= 900 mm and outfall OD= 630 mm
  • Length: 3,407 m (intake) and 2,546 m (outfall)
  • Flow rate: 0.44 m3/s (intake) and 0.26 m3/s (outfall)
  • Intake depth: -8 m and discharge depth: -5 m

 

Basic studies:

  • All the basic studies necessary to define the work were carried out (wave study, hydraulic and structural calculations, etc.).
  • A causeway was designed for the construction of the pipes in the surf zone.

Related projects