BASIC ENGINEERING OF THE UNDERWATER PIPELINES FOR THE ZARAT DESALINATION PLANT TENDER (TUNISIA)

[bloque_categoria_proyecto]
Scope:
Basic Engineering for the Tender
Location:
Zarat (Tunisia)

The basic engineering for the intake and discharge pipelines of the Zarat desalination plant in Tunisia is carried out, including its intake tower. The characteristics of the pipelines are: • Material: PE100. • Outside diameter (Øe) intake: 1,800 mm and discharge: 1,400 mm • Lengths intake: 2,852 m and discharge: 2,015 m • Flow rates intake: 2.66 m3/s and discharge: 1.51 m3/s • Depths intake: 10 m and discharge: 7 m A specific study has been carried out on the following aspects: • Marine climate: using the SWAN model for wave propagation. • Dilution study. • Laying process.

Related projects

It seems we cannot find what you are looking for.