ARRASTRE POR FONDO DE LA CONDUCCIÓN DE VERTIDO DE LA PLANTA DE TRATAMIENTO DE LA CHIRA, PERÚ

[bloque_categoria_proyecto]
Scope:
Detail engineering

Design of the installation using off-bottom pull (off-bottom pull) with chain support

• The pipeline characteristics are:

• Discharge flow rate: 11.3 m3/s

• Internal diameter: 2,400 mm

• Maximum depth: 60 m

• Length: 3,627 m

Numerous tasks are carried out in connection with defining the off-bottom pull construction process:

• Current study (magnitude and direction)

• Estimation of forces generated by waves and currents

• Design of three types of buoys: flotation, regulation, and pull

• Modelling of the pipe’s structural behaviour using 3D Structural Analysis Software

• Calculation and construction layout of chains

• Design of the pulling system: ropes and cables, pulleys, and their fastening

• Design of a complementary restraint system with anchors and cables

Related projects