DESIGN OF HDPE LAND PIPELINES FOR THE MONTOIR CTCC, FRANCE

The objective is to perform the necessary calculations to ensure the validity of the PPA & KRAH pipes against the loads to which they will be subjected. All situations that may cause pipeline collapse will be analyzed and a profile is recommended for each of the lines that make up the pipelines. Various situations have […]
DESIGN OF THE SUMP AND DISCHARGE RAMP FOR THE MONTOIR DE BRETAGNE OUTFALL SYSTEM. CCGT 435 MW, FRANCE

SUMP Supporting calculations and construction drawings for the discharge system sump: • Excavation using sheet pile walls. Calculation using RIDO software. • Pile-supported slab. • Reinforced concrete sump. • Modeling with 3D Structural Analysis Software. DISCHARGE RAMP • 6 HDPE pipes, each 21 m long. Structured wall. ID = 2,000 mm. • Design of special […]