SIMPLE CYCLE THERMOELECTRIC POWER PLANT. GRAN MARISCAL INDUSTRIAL COMPLEX. AYACUCHO (GÜIRIA- VENEZUELA). EQUIPMENT LOADING QUAY AND BREAKWATER
Jetties
- Start Date / End Date: 2011
- Place: GÜIRIA- VENEZUELA
- Scope: Basic Design
- Description: 1.Alternative layout study2.Equipment loading quay• Typical ship: L = 77 m; B = 15 m; Dmax = 2.50 m• Front unloading with gondola (L = 40 m + tractor head on the ground). Maximum equipment weight: 240 t• Quay:•Temporary (Useful life: 3 years)•Type: precast mass concrete blocks•Length: 40 m•Platform: 30 m wide• Access embankment:•Quay - land connection•Type: Rubble mound (core, filter and outer armour with precast MC blocks)•Length: 200 mProtection breakwater
• Marine climate study• Layout alternatives• Length: 165 m, plus heads• Type: Rubble mound•Random fill core•Rock filter•Outer armour: precast mass concrete (MC) blocks