BASIC PROJECT FOR A HYDROCARBON TRANSFER TERMINAL IN THE BAY OF MONTEVIDEO, URUGUAY
Jetties
- Start Date / End Date: 2012/2013
- Place: Montevideo (URUGAY)
- Scope: Basic Project Design
- Description:
1.Structure for the maritime terminal on piles along with the dredging of the dock.
- Loading platform (51 x 20 m)
- 4 mooring dolphins
- 2 breasting dolphins
- Connection gangways
- 75 reinforced concrete piles, D=1200 mm
2.Rubble mound breakwater to protect the maritime terminal, extending the existing one.
- L ≈ 350 m
- Protection with 5 and 8 tonne Cubipods.
3.Underwater pipes to transport hydrocarbons from the Maritime Terminal to the land-based refinery.
- 8 to 24” steel pipes
- Fibre optic and power lines
- Length of each one:
- ≈ 2,225 m submerged
- ≈ 225 m aerial
- New esplanade measuring
- ≈ 9.5 ha.
- Perimeter closure embankment (L ≈ 880 m)
- Blocks quay (loading bay):
- L≈60 m
- Depth = 8.5 m
- Water depth = 4 m