LIQUID BULK TERMINAL AT PUERTO BAHIA, CARTAGENA, COLOMBIA. OFFSHORE INFRASTRUCTURE AND OPERATIONS JETTY
Jetties
- Start Date / End Date: 2011/2012
- Place: Cartagena de Indias (Colombia)
- Scope: Analysis, Reports, Quantities and Basic Project
- Description: 1.Document analysis and basic project. Identification of deficiencies, vagueness and contradictions. Assessment of risks and opportunities. Quantities.2.Improvements to the base solution defined: a piled jetty with two mooring posts for tankers, with a maximum freeboard length of 275 m (Suezmax).3.Proyecto Variante:• Geotechnical study: land modelling, geotechnical units, parameterization and profile.• Independence of integrated mooring dolphins• Calculation of the viaduct deck. Two options: precast slabs and in situ.• Viaduct pile optimization (lengths and thicknesses). Vertical instead of inclined• Drawings• Quantities
IMAGES OF THE PROJECT
RELATED PROJECTS
See more projects