NEW LNG REGASIFICATION PLANT JETTY PRE-DESIGN
Jetties
- Start Date / End Date: 2011
- Place: HUELVA (SPAIN)
- Scope: Studies and reports
- Description:
Studies for the administrative concession for the construction of a mooring quay for LNG carriers
• Project carrier: Q-max•Freeboard length: 345 m•Breadth: 53,8 m•Depth: 34,7 m•Maximum draught: 12,0 m•Capacity: 266.000 m3• Jetty pre-design, analysing mainly the following aspects:1.Characterization of dredging material: sampling and laboratory analysis campaign2.Study of cargo waste and ship residue collection systems3.Study of interference of pipes and pipelines with existing roads
IMAGES OF THE PROJECT
RELATED PROJECTS
See more projects