MARINE PIPELINES AND PUMP STATION FOR THE DESALINATION PLANT IN THE ERONGO REGION (NAMIBIA)

[bloque_categoria_proyecto]
Scope:
Preparation of the Basic Tender Design
Location:
ERONGO REGION, NAMIBIA

Intake and discharge pipelines and pump station for a new desalination plant, as well as coastal protection.
Pipelines: Design constrained by the rocky nature of the seabed and rough seas → Horizontal Directional Drilling (HDD) along most of the alignment.

INTAKE

DISCHARGE

Material

PE 100, solid wall

No. of pipelines

2

2

Outside diameter (mm)

1200

1000

Length (m)

Total
HDD

2 x 1863 = 3726
2 x 1807 = 3614

1296 + 1176 = 2472
1180 + 1060 = 2240

Maximum flow rate (m3/h)

8690

8690 / 4860 (operation)

• Precast concrete intake structure
• 200 m diffuser section, 2 outlets every 20 m (12 outlets in total)

Pump station: 6 filter channels and 6 pumps (Q = 1930 m3/h). Hydraulic, formwork, and structural design, and construction methodology.

Related projects

It seems we cannot find what you are looking for.