BASIC PROJECT FOR THE WAVE POWER PLANT AT THE “LA GUARDIA” PORT (PONTEVEDRA, SPAIN)

BREAKWATERS

  • Start Date / End Date: 2009
  • Place: PONTEVEDRA (SPAIN)
  • Scope: Drafting of the Basic Project
  • Description:

    In light of the demand for alternative electricity, this Project is drafted in order to raise the possibility of the installation of a wave power plant in the "A Guarda" Port
    The projected works consist of the installation of a total of 20 modules each comprised of:

    • A wave collector
    • A turbo-generator (Wells turbine)
    • A control system

    A reinforced concrete caissons solution has been selected (a total of three), navally stable, that are transported by means of flotation and are sunk to their definitive location, so as to thereafter be raised to their final configuration positions.

     

     


 IMAGES OF THE PROJECT

 
BASIC PROJECT FOR THE WAVE POWER PLANT AT THE “LA GUARDIA” PORT (PONTEVEDRA, SPAIN)

 RELATED PROJECTS

See more projects
DESIGN PROJECT OF ENLARGEMENT OF SANTA CRUZ DE LA PALMA BREAKWATER, LA...
ALTERNATIVE CONSTRUCTION PROJECT TO EXPAND THE PORT OF PLAYA BLANCA, L...
ALTERNATIVE TENDER PROJECT OF AGAETE HARBOUR EXPANSION, GRAN CANARIA (...