AN ADJUSTMENT AND PREPARATION PROJECT FOR THE RAICES (ASTURIAS, SPAIN) QUAY CONSIDERING NEW TRAFFIC

QUAYS

  • Place: Avilés, Asturias (Spain)
  • Scope: Writing of the Preliminary Project and EIA
  • Description:

    The water depth at the Raices Quay is increased from the current 8.7 m to 14 m with a quay advance.
    The dredging is done on category C contaminated material which led to the sheet pile solution being chosen following a study of alternatives.
    Environmental care is of utmost importance in this area as the worksite is located in NATURA 2000 NETWORK zones: ZEC ES1200055 and ZEPA ES0000318.
    The solution planned is summarized as follows:
        •   A complete study of alternatives
        •   The designing of a combined front sheet pile (HZ 1180M D-14/AZ 20-700) and rear sheet pile (AZ 36-700 N).
        •   The confinement of the dredged contaminated material (85,000 m3)
        •   The designing of the load relief slab to reduce the push load on the sheet pile
        •   New paving
        •   Installation work
    Included is a complete Environmental Impact Assessment for the ordinary processing of the Project


 IMAGES OF THE PROJECT

 
sheet pile  quay    Avilés, Asturias  Spain
sheet pile  quay   Avilés, Asturias  Spain

 RELATED PROJECTS

See more projects
ALTERNATIVE CONSTRUCTION PROJECT, SECOND STRETCH OF THE PORT OF GRANAD...
ALTERNATIVE CONSTRUCTION PROJECT FOR THE NORTH-WESTERN QUAY ESPLANADE ...
DESIGN PROJECT OF NORTHERN ENLARGEMENT OF SOUTHERN QUAY, HUELVA...