NEW SEA WATER INTAKE FACILITIES – IN ABU DHABI, EMIRATES

OTHER WATER INTAKES

  • Start Date / End Date: 2008/2009
  • Place: Ruwais (U.A.E.)
  • Scope: FEED (Front End Engineering & Design)
  • Description:

    Define the overall project requirements, design data for common facilities and common design philosophies, with the intent of ensuring uniformity in design practices.

    Located between existing Sea Water Intake -1 (SWI-1) and Sea Water Intake -2 (SWI-2) facilities

    The scope of work includes the design / study / analysis for the major activities.

    Most important characteristics of this project:

        •    Adequacy check and studies of existing Intake Channel feeding the SWI-1 facility, and to propose design modifications required to accommodate the new SWI-3 pump house and meet the additional seawater demand.
        •    Design of Seawater Intake Structure (Pump Bay) to house the new FERTIL Seawater supply pumps.
        •    Dredging study
     

    Dredging study

     Stop Logs and Guide frames packages for isolation purposes.

     Screening:

     Coarse Screens (Bar Rake Screens)

     Fine Screens (Traveling Band Screens)

     Five new Seawater pumps of 17,500 m3/h capacity each

    The Study of the hydraulic behavior of the canals in the pump house by CFD (Computational Fluid Design).

     


 IMAGES OF THE PROJECT

 
NEW SEA WATER INTAKE FACILITIES – IN ABU DHABI, EMIRATES

 RELATED PROJECTS

See more projects
STUDY OF THE INTAKE CAISSON ADAPTATION OF THE COMBINED CYCLE POWER PLA...
CONSTRUCTION PROJECT OF THE PUMPING STATION GRANADILLA II (TENERIFE, S...
DRAWING UP THE CONSTRUCTION PROCEDURES FOR THE SUBMERGED CONCRETE SLAB...