WAVE POWER PLANT AT THE PORT OF A GUARDA. PONTEVEDRA

In response to the demand for alternative electrical energy, this project is drafted to assess the feasibility of installing a wave power plant at the Port of A Guarda. The planned works consist of the installation of a total of 20 composite modules, each comprising: • A wave collector • A turbo-generator (Wells turbine) • […]
EAST BREAKWATER, DREDGING AND ACCESS IMPROVEMENT TO THE SOUTH BASIN OF THE PORT OF CASTELLÓN. EXTENSION

Variant Project with adaptation of the internal structure and the lengths of the caissons to the contractor’s formwork. The works consist of: • Construction of a 372 m extension breakwater using a mixed section of caissons and 15 m³ and 20 m³ blocks at the head • Construction of two Ro-Ro ramps using caissons at […]
Construction design project for the extension of the breakwater quay