BASIC PROJECT FOR THE RAS DJINET COMBINED CYCLE POWER STATION COOLING CIRCUIT, ALGERIA

UNDERWATER PIPELINES

  • Start Date / End Date: 2011
  • Place: DOUAR MENDIL (ARGELIA)
  • Scope: Basic Tender Project
  • Description:

    The Basic Project was prepared for the Ras Djinet combined cycle power station cooling system. The pump station, intake pipelines and discharge canal were pre-sized.

    The characteristics of the submarine outfall are as follows:

        •    Material: PE100.
        •    Inside diameter: Three 2,400 mm pipes (1 as a reserve)
        •    Average length of polyethylene: 1,496 m
        •    Flow rate: 10 m3/s
        •    Discharge canal outfall
     

    The first step was to use available studies to estimate the intake depth required to collect water at a temperature that would guarantee the proper system cooling. Once the depth was defined, the cooling system was sized.

     

     


 IMAGES OF THE PROJECT

 
BASIC PROJECT FOR THE RAS DJINET COMBINED CYCLE POWER STATION COOLING CIRCUIT, ALGERIA

 RELATED PROJECTS

See more projects
MARINE CLIMATE AND RECIRCULATION STUDY USING A DIGITAL MODEL TO ADAPT ...
CONSTRUCTION PROJECT FOR THE UNDERWATER PIPES AT THE SPENCE GROWTH DES...
WAVE STUDY AND RECIRCULATION STUDY FOR DIFFERENT DESALINATION PLANTS I...