MARINE CLIMATE AND RECIRCULATION STUDY USING A DIGITAL MODEL FOR THE RABIGH DESALINATION PLANT (PHASE 4/5 for 600,000 m3/d)
Submarine pipes
- Start Date / End Date: 2019 - 2019
- Place: Rabigh (Saudi Arabia)
- Scope: Digital modeling Baseline Study
- Description:
A series of studies are done to be used as the basis for the desalination plant tender process.
The studies completed are as follows:
• Wave study: Using wave data in deep waters, the design waves associated with return periods of 1, 10, 50 and 100 years are propagated using the SWAN model. They are propagated in all directions possible. The results are obtained for the future intake and outfall points for phases 4 and 5.
• Recirculation study. Included is the design of the diffuser to comply with environmental laws and a complete recirculation study guaranteeing there will be no brine recirculation with the defined intake location. The MOHID model is used. The future phases 4 and 5 as well as phase 3, currently under construction, are simulated.
IMAGES OF THE PROJECT
RELATED PROJECTS
See more projects