DETAILED ENGINEERING OF THE DISCHARGE PIPELINE FOR THE AGUILAS DESALINATION PLANT (MURCIA, SPAIN)
UNDERWATER PIPELINES
- Start Date / End Date: 2010
- Place: AGUILAS (MURCIA, SPAIN)
- Scope: Detailed engineering
- Description:
Execution of the hydraulic and structural calculation of the pipeline, including the sinking and the analysis of the necessary ballast. The ballast is optimised in 6 sections by calculating its reinforcement.
• Outer diameter: 1.4 m• Length: 879 m• Number of diffusers: 24• Separation between diffusers: 8 m• Maximum depth: -28 m
IMAGES OF THE PROJECT


RELATED PROJECTS


