DESIGN OF WATER TANK AND DUMPING RAMP OF THE DISCHARGE SYSTEM IN MONTOIR DE BRETAGNE (FRANCE)
UNDERWATER PIPELINES
- Start Date / End Date: 2007/2008
- Place: MONTOIR (FRANCE)
- Scope: Construction Design
- Description:
WATER TANK
Technical support calculations and construction level drawings of the discharge system of the Montoir CCGT Power Plant 435 MW:
• Excavation via sheet piled walls. Calculation via RIDO program.• Platform reinforced with piles.• Reinforced concrete intake well.• Modelling with 3D Structrural Analysis Software.DUMPING RAMP
• 6 PEAD pipes each measuring 21 m in length. Structured pipe. Diameter = 2,000 mm.• Design of special diffuser parts at the end of pipes• Hydraulic design advice. Analysis and validation of developed hydraulic models, some of them with ANSYS program.• Hydraulic calculations.
IMAGES OF THE PROJECT
RELATED PROJECTS