INCREA in the Magazine FuturENVIRO (November 2013) 08/01/2014
INCREA in the Magazine FuturENVIRO (November 2013)
INCREA, which did the engineering for the submarine intake pipelines and the brine outfall for the Marina Baja Desalination Plant (Mutxamel, Alicante), is mentioned in the article in the magazine FuturENVIRO describing the desalination plant.
The work was done for the PPA Group which was awarded the execution of the marine work for the temporary joint venture UTE Mutxamel.
The magazine can be found at the following link page 59.
The work done by INCREA for the project is described in detail in our references section see reference