Este sitio Web utiliza cookies propias y de terceros con objeto de mejorar la experiencia de navegación. Si continúa navegando estará aceptando de forma expresa el uso de estas cookies. Puede obtener más información en nuestra página Uso de Cookies

Accept Reject

Home   >  News

INAUGURATION OF THE REPSOL JETTY AT THE A CORUÑA EXTERIOR PORT

On 3 March 2023, the Repsol jetty at the A Coruña Exterior Port was inaugurated.  INCREA participated in its construction by carrying out both the tender engineering for Sacyr as well as the detailed engineering after Sacyr was awarded the contract.

The 520 m jetty is comprised of 19 prefabricated concrete caissons and will allow access for ships as long as 290 metres.  The image show the arrival of Front Ocelot, the first crude tanker in history to enter the A Coruña Exterior Port.

Several authorities attended the opening ceremony including the Chairman of Repsol, Antonio Brufau, and the President of the Xunta regional government, Alfonso Rueda

https://www.lavozdegalicia.es/noticia/economia/2023/03/04/repsol-reduce-30-tiempo-descarga-crudo-gracias-langosteira/0003_202303G4P30994.htm

https://www.linkedin.com/posts/irenesoutoblazquez_puertoexterior-pantalaern-crudo-activity-7037488737701744640--S7Z/?utm_source=share&utm_medium=member_desktop