ACCIONA completes the construction of Shuqaiq 3 desalination plant in Arabia Saudí
ACCIONA has completed the construction of the SWPC’s Shuqaiq 3 Independent Water Project (IWP) Seawater Reverse Osmosis (SWRO) desalination in Saudi Arabia and it is working at full capacity, which will produce 450,000 cubic meters of potable water per day and served 2,000,000 people.
INCREA participated as an engineering specialist in marine pipelines in the design of the works during the tender phase and carried out the detailed engineering during the execution phase of both the seawater intake and the outfall.