CONSTRUCTION PROJECT OF THE DISCHARGE PIPELINE FOR THE SEWAGE TREATMENT PLANT OF LA TABOADA (LIMA, PERU)
UNDERWATER PIPELINES
- Start Date / End Date: 2010/2011
- Place: LIMA (PERU)
- Scope: Construction Project
- Description:
Execution of the construction project of the submarine outfall for La Taboada, with the conclusions of the field works undertaken, after ACS Group won the international tender, in which INCREA carried out the engineering.
Execution of comprehensive studies of the final location, auxiliary works, suppliers, etc
• Material: HDPE-100• Internal Diameter of main section: 3 m• Internal Diameter is variable in diffuser section: 3 m in the first 340 m, 2.4 m in the following 330 m and 1.8 in the last 330 m• Maximum flow rate of 20 m3/s and average flow rate of 14m3/s• Length of 3,698 m, including the 1,000 m of the diffuser section• 250 risers with two diffusers each. Variable hole diameter• Average discharge depth: 10.9 mDifferent design alternatives are studied in order to achieve the optimum between dredging and pipe protection.
IMAGES OF THE PROJECT
RELATED PROJECTS
See more projects