SIMPLE CYCLE THERMOELECTRIC POWER PLANT. GRAN MARISCAL INDUSTRIAL COMPLEX. AYACUCHO (GÜIRIA- VENEZUELA). EQUIPMENT LOADING QUAY AND BREAKWATER

Jetties

  • Start Date / End Date: 2011
  • Place: GÜIRIA- VENEZUELA
  • Scope: Basic Design
  • Description:
    1.Alternative layout study
    2.Equipment loading quay
        •    Typical ship: L = 77 m; B = 15 m; Dmax = 2.50 m
        •    Front unloading with gondola (L = 40 m + tractor head on the ground). Maximum equipment weight: 240 t
        •    Quay:
    •Temporary (Useful life: 3 years)
    •Type: precast mass concrete blocks
    •Length: 40 m
    •Platform: 30 m wide
     
        •    Access embankment:
    •Quay - land connection
    •Type: Rubble mound (core, filter and outer armour with precast MC blocks)
    •Length: 200 m
     
    Protection breakwater
     
        •    Marine climate study
        •    Layout alternatives
        •    Length: 165 m, plus heads
        •    Type: Rubble mound
    •Random fill core
    •Rock filter
    •Outer armour: precast mass concrete (MC) blocks
     
     

 IMAGES OF THE PROJECT

 
SIMPLE CYCLE THERMOELECTRIC POWER PLANT. GRAN MARISCAL INDUSTRIAL COMPLEX. AYACUCHO (GÜIRIA- VENEZUELA). EQUIPMENT LOADING QUAY AND BREAKWATER
SIMPLE CYCLE THERMOELECTRIC POWER PLANT. GRAN MARISCAL INDUSTRIAL COMPLEX. AYACUCHO (GÜIRIA- VENEZUELA). EQUIPMENT LOADING QUAY AND BREAKWATER
SIMPLE CYCLE THERMOELECTRIC POWER PLANT. GRAN MARISCAL INDUSTRIAL COMPLEX. AYACUCHO (GÜIRIA- VENEZUELA). EQUIPMENT LOADING QUAY AND BREAKWATER

 RELATED PROJECTS

See more projects
BASIC PROJECT FOR A HYDROCARBON TRANSFER TERMINAL IN THE BAY OF MONTEV...
LIQUID BULK TERMINAL AT PUERTO BAHIA, CARTAGENA, COLOMBIA. OFFSHORE IN...
NEW LNG REGASIFICATION PLANT JETTY PRE-DESIGN...