TENDER PROJECT FOR THE WESTERN COMMERCIAL WHARF AT THE PORT OF MARIN (PONTEVEDRA,SPAIN)

QUAYS

  • Start Date / End Date: 2009
  • Place: MARIN, PONTEVEDRA (SPAIN)
  • Scope: Drafting of the Tender ProjecT
  • Description:

    The Alternative Tender Project is drafted in order to carry out a more optimum design of the closure of the wharf subject of the Project with the existing Manuel Leirós wharf.
    The project comprises the extension of the Leirós Wharf No. 2 of a length of 30.37 metres with a water depth of 12 metres in BMVE, so as to support in a perpendicular direction toward the south the berthing wharf of 283 metres long, with a water depth in BMVE of 15 metres.
    In this Alternative Project the submerged concrete caisson of the design of the base solution is replaced by a structure formed by a stepped wall of submerged concrete.
    In this manner adaptations to the formwork of caissons are avoided, and a perfect connection with the two connecting wharfs is guaranteed, as it is concreted against two caissons.


 IMAGES OF THE PROJECT

 
TENDER PROJECT FOR THE WESTERN COMMERCIAL WHARF AT THE PORT OF MARIN (PONTEVEDRA,SPAIN)
TENDER PROJECT FOR THE WESTERN COMMERCIAL WHARF AT THE PORT OF MARIN (PONTEVEDRA,SPAIN)

 RELATED PROJECTS

See more projects
GEOTECHNICAL AND STRUCTURAL STUDIES FOR THE RIBERA II QUAY. CARBONERAS...
OPTIMISATION OF THE TYPICAL CAISSON REINFORCEMENT FOR THE QUAY NEXT TO...
ALTERNATIVE TENDER PROJECT FOR THE NEW CONTAINER TERMINAL. PHASE I. CA...