CONSTRUCTION PROJECT OF THE SUBMARINE PIPELINES FOR THE CAP D´JINET DESALINATION PLANT (ALGERIA)

UNDERWATER PIPELINES

  • Start Date / End Date: 2009
  • Place: CAP D´JINET (ARGELIA)
  • Scope: Construction Project
  • Description:

    After the previous studies about environment and maritime climate done by the Temporary Joint Venture, the dimensioning and design of the submarine pipelines of the desalination plant are carried out.

    Furthermore, the diffuser section and the intake tower are designed for an optimal performance.

    The features of the pipelines are:

        •    Material: PE100.
     
        •    Inner diameter:
    • Intake: 1,800 mm
    • Waste: 1,200 mm
     
        •   Length of polyethylene:
    • Intake: 1,779 m
    • Waste: 1,170 m
     
        •    Flow rate:
    • Intake: 2.64 m3/s
    • Waste: 1.42 m3/s
     
     

 IMAGES OF THE PROJECT

 
CONSTRUCTION PROJECT OF THE SUBMARINE PIPELINES FOR THE CAP D´JINET DESALINATION PLANT (ALGERIA)
CONSTRUCTION PROJECT OF THE SUBMARINE PIPELINES FOR THE CAP D´JINET DESALINATION PLANT (ALGERIA)

 RELATED PROJECTS

See more projects
PUNTA YEGUAS OUTFALL, MONTEVIDEO (URUGUAY)...
INTAKE AND OUTFALL PIPELINES FOR THE SANITATION AND SUPPLY SYSTEM IN T...
MARINE CLIMATE AND DILUTION STUDY TO FIND ALTERNATIVE LOCATIONS FOR TH...