Este sitio Web utiliza cookies propias y de terceros con objeto de mejorar la experiencia de navegación. Si continúa navegando estará aceptando de forma expresa el uso de estas cookies. Puede obtener más información en nuestra página Uso de Cookies

Accept Reject

Home   >  References

MARINE CLIMATE AND DILUTION STUDY TO FIND ALTERNATIVE LOCATIONS FOR THE NEW BIOMASS POWER PLANT, SPAIN

marine pipelines-p

  • Start Date / End Date: 2014
  • Place: LAS PALMAS DE GRAN CANARIA AND GRANADILLA, SPAIN
  • Scope: Reports
  • Description:

    The work for this study to find different options for the location of a new biomass power plant in the Canary Islands includes the following studies:

    The characteristics of the pipe:
       • A marine climate study to find a location in La Esfinge
       • An outfall dilution study to find a location in La Esfinge
       • A marine climate study to find a location in Granadilla.
    The studies were done using the CORMIX model, in the case of the initial dilution studies, and the SWAN model, in the case of the wave study.


 IMAGES OF THE PROJECT

 

 RELATED PROJECTS

See more projects
MARINE CLIMATE AND RECIRCULATION STUDY USING A DIGITAL MODEL TO ADAPT ...
CONSTRUCTION PROJECT FOR THE UNDERWATER PIPES AT THE SPENCE GROWTH DES...
WAVE STUDY AND RECIRCULATION STUDY FOR DIFFERENT DESALINATION PLANTS I...