Este sitio Web utiliza cookies propias y de terceros con objeto de mejorar la experiencia de navegación. Si continúa navegando estará aceptando de forma expresa el uso de estas cookies. Puede obtener más información en nuestra página Uso de Cookies

Accept Reject

Home   >  References

CONSTRUCTION PROCESS DETAILED PROJECT FOR THE BENS SUBMARINE OUTFALL (LA CORUÑA, SPAIN)

Underwater pipelines

  • Start Date / End Date: 2008
  • Place: LA CORUÑA, SPAIN
  • Scope: Constructution Processes
  • Description:

    This detailed project studied the construction processes and auxiliary elements to sink the polyethylene section.  The first section was done with jacking.
    The outfall in the deepest area was designed in PE100 with the following features:
              • Outside diameter: 1,600 mm SDR 26
              • Length : 360 m
              • Maximum depth 40.7 m  
    Specifically, the sinking process using floaters and concrete deadman anchors was studied along with the slings to be used and the flanges and reinforcement to be implemented in the diffuser area

     


 IMAGES OF THE PROJECT

 
CONSTRUCTION PROCESS DETAILED PROJECT FOR THE BENS SUBMARINE OUTFALL (LA CORUÑA, SPAIN)
CONSTRUCTION PROCESS DETAILED PROJECT FOR THE BENS SUBMARINE OUTFALL (LA CORUÑA, SPAIN)
CONSTRUCTION PROCESS DETAILED PROJECT FOR THE BENS SUBMARINE OUTFALL (LA CORUÑA, SPAIN)

 RELATED PROJECTS

See more projects
MARINE CLIMATE AND RECIRCULATION STUDY USING A DIGITAL MODEL FOR THE R...
WAVE STUDY AND RECIRCULATION STUDY FOR DIFFERENT DESALINATION PLANTS I...
MARINE CLIMATE AND RECIRCULATION STUDY USING A DIGITAL MODEL TO ADAPT ...