ALTERNATIVE CONSTRUCTION PROJECT TO EXPAND THE SEMI-DETACHED QUAY PHASE 2 B (MULTI-PURPOSE TERMINAL)

QUAYS

  • Place: Palma de Mallorca, Spain
  • Scope: Tender project
  • Description:

    The work involved with this project is aimed at extending the 2nd Alignment of the Semi-Detached Quay to generate an additional mooring line measuring 290 m with a water depth of 16.00 m, planned in the short and long-term for the extension of the adjacent container terminal and in the medium to long-term to allow cruise ships breasting, as necessary.

    This Project is an Alternative Solution with respect to the Baseline Project.

    The Project includes the following work:
            • Structural resizing of the caissons:
            • Switching from caissons with rectangular cells to circular cells and switching from 7 to 6 caissons
            • Reinforcement calculation
            • Naval stability calculation of the caissons
            • Verification of the stability


 IMAGES OF THE PROJECT

 
sheet pile  quay  construction works  Palma de Mallorca
sheet pile  quay  construction works   Palma de Mallorca
sheet pile  quay  construction works   Palma de Mallorca

 RELATED PROJECTS

See more projects
ALTERNATIVE CONSTRUCTION PROJECT, SECOND STRETCH OF THE PORT OF GRANAD...
ALTERNATIVE CONSTRUCTION PROJECT FOR THE NORTH-WESTERN QUAY ESPLANADE ...
DESIGN PROJECT OF NORTHERN ENLARGEMENT OF SOUTHERN QUAY, HUELVA...