Home   >  References

QINGDAO (CHINA) DESALINATION PLANT OUTFALL CONSTRUCTION PROJECT

UNDERWATER PIPELINES

  • Start Date / End Date: 2010
  • Place: QINGDAO (CHINA)
  • Scope: Construction Project Writing
  • Description:

    The construction project for the Qingdao desalination plant submarine outfall is prepared. Trench aggradation, coastal dynamics and beach profile evolution studies were done for the project. The project also included consulting on possible pipe suppliers in China.

    Furthermore, a study was done on the different types of navigation aids that can be used for a job of these characteristics (very shallow depths).

        •    Outside diameter: 1,600 mm
        •    The first 1,489 m are in GRP
        •    The last 1,450 m will be in PE
        •    Normal flow rate 1.77 m3/s
        •    Maximum flow rate 3.03 m3/s
        •    The diffuser section features six 600 mm raisers
     
     
     

 IMAGES OF THE PROJECT

 
QINGDAO (CHINA) DESALINATION PLANT OUTFALL CONSTRUCTION PROJECT
QINGDAO (CHINA) DESALINATION PLANT OUTFALL CONSTRUCTION PROJECT

 RELATED PROJECTS

See more projects
PUNTA YEGUAS OUTFALL, MONTEVIDEO (URUGUAY)...
INTAKE AND OUTFALL PIPELINES FOR THE SANITATION AND SUPPLY SYSTEM IN T...
MARINE CLIMATE AND DILUTION STUDY TO FIND ALTERNATIVE LOCATIONS FOR TH...