PROTECTION OF THE MARINE PLATFORM AT THE KOUDIET COMBINED CYCLE POWER STATION (ALGERIA)

BREAKWATERS

  • Start Date / End Date: 2008/2011
  • Place: KOUDIET, (ARGELIA)
  • Scope: Construction Project writing and technical consulting
  • Description:

    The Construction Project for the Koudiet combined cycle power station seawater intake pipelines included the design of the Koudiet marine platform protection.
    The studies completed covered:

    • A calculation of the protective rock: A calculation using the Hudson and Van der Meer formula.
    • A calculation of the anti-erosion rock at the foot of the breakwater
    • The platform crest elevation
    • The adaptation of the sections available to the existing material.
    • An overflow study.
    • The definition of the provisional breakwater to install the land pipelines.
    • A rock sampling procedure after the execution of the breakwater
    • The calculation of the platform guard wall against overflow
    • The design of the road over the breakwater


    The stability, overflow and erosion calculations and designs were verified by means of small-scale tests and by means of a numerical modelling of the dynamic wave filtration through the breakwater.  All of this was done with technical advice from INCREA



     


 IMAGES OF THE PROJECT

 
PROTECTION OF THE MARINE PLATFORM AT THE KOUDIET COMBINED CYCLE POWER STATION (ALGERIA)
rock protection breakwater hudson and van der meer formula
RUBBLE MOUND BREAKWATER

 RELATED PROJECTS

See more projects
VARIABLE ALTERNATIVE CONSTRUCTION PROJECT FOR THE NEW WESTERN BREAKWAT...
CALCULATIONS RELATING TO THE GRANADILLA COUNTERDIKE...
TENDER PROJECT FOR THE REPARATION OF THE WAVE POWER PLANT IN THE PORT ...