Home   >  References

PRELIMINARY PROJECT FOR THE EFFLUENT PIPELINE FROM THE CELLULOSE AND ENERGY PLANT IN PUNTA PEREIRA (URUGUAY)

UNDERWATER PIPELINES

  • Start Date / End Date: 2008
  • Place: PUNTA PEREIRA (URUGUAY)
  • Scope: Preliminary Design for Bid
  • Description:

    Preliminary Design project of the effluent pipeline from the Punta Pereira paper mill (Uruguay). Part of the Complete Project of the paper mill, comprising one of its chapters.

    The characteristics of the pipeline are:

        •    OD=1,400 mm
        •    PE-80 SDR 33 Pipe
        •    Q=2m3/s
        •    Length 1,880 m

     

    The following aspects of the conduit are studied:

        •    Design of diffuser and dumping process
        •    Design of ballast weight
        •    Installation process
        •    Construction processes
        •    Beaconing
     
     
     

 IMAGES OF THE PROJECT

 
 PRELIMINARY PROJECT FOR THE EFFLUENT PIPELINE FROM THE CELLULOSE AND ENERGY PLANT IN PUNTA PEREIRA  (URUGUAY)
 PRELIMINARY PROJECT FOR THE EFFLUENT PIPELINE FROM THE CELLULOSE AND ENERGY PLANT IN PUNTA PEREIRA  (URUGUAY)
 PRELIMINARY PROJECT FOR THE EFFLUENT PIPELINE FROM THE CELLULOSE AND ENERGY PLANT IN PUNTA PEREIRA  (URUGUAY)

 RELATED PROJECTS

See more projects
PUNTA YEGUAS OUTFALL, MONTEVIDEO (URUGUAY)...
INTAKE AND OUTFALL PIPELINES FOR THE SANITATION AND SUPPLY SYSTEM IN T...
MARINE CLIMATE AND DILUTION STUDY TO FIND ALTERNATIVE LOCATIONS FOR TH...