Este sitio Web utiliza cookies propias y de terceros con objeto de mejorar la experiencia de navegación. Si continúa navegando estará aceptando de forma expresa el uso de estas cookies. Puede obtener más información en nuestra página Uso de Cookies

Accept Reject

Home   >  News

INAUGURATION OF THE REPSOL JETTY AT THE A CORUÑA EXTERIOR PORT

On 3 March 2023, the Repsol jetty at the A Coruña Exterior Port was inaugurated.  INCREA participated in its construction by carrying out both the tender engineering for Sacyr as well as the detailed engineering after Sacyr was awarded the contract. The 520 m jetty is comprised of 19 prefabricated concrete caissons and will allow access for ships as long as 290 metres.  The image show the arrival of Front Ocelot, the first crude tanker in history to enter the A Coruña Exterior Port.

Eloy Pita at the IDA 2022 World Congress in Sydney

Great success of the conference given by Eloy Pita at the IDA 2022 World Congress in Sydney, last week: "Proper Design of intake and outfalls to avoid main risks during operation".In this conference, some of the problems that can occur during the operation of desalination plants and the way to solve them were discussed.

ACCIONA completes the construction of Shuqaiq 3 desalination plant in Arabia Saudí

ACCIONA has completed the construction of the SWPC’s Shuqaiq 3 Independent Water Project (IWP) Seawater Reverse Osmosis (SWRO) desalination in Saudi Arabia and it is working at full capacity, which will produce 450,000 cubic meters of potable water per day and served 2,000,000 people.  INCREA participated as an engineering specialist in marine pipelines in the design of the works during the tender phase and carried out the detailed engineering during the execution phase of both...

INCREA WILL CARRY OUT THE DETAILED ENGINEERING OF THE PIPES OF THE SHUQAIQ-I DESALINATION PLANT FOR ACCIONA.

ACCIONA will build its fifth desalination plant in Saudi Arabia: Shuqaiq-I, with a capacity of 400,000 m3 per day. INCREA, as a specialist company in large-diameter subsea pipelines for desalination plants, is participating in the Project by carrying out the detailed engineering of the pipelines. Previously, it participated in the bidding phase carrying out the engineering of the pipes. The Shuqaiq-3 desalination plant is currently in the execution phase by ACCIONA, and the detailed engineering...
PreviousNext