  • Start Date / End Date: 2008/2009
  • Place: Ruwais (U.A.E.)
  • Scope: FEED (Front End Engineering & Design)
  • Description:

    Define the overall project requirements, design data for common facilities and common design philosophies, with the intent of ensuring uniformity in design practices.

    Located between existing Sea Water Intake -1 (SWI-1) and Sea Water Intake -2 (SWI-2) facilities

    The scope of work includes the design / study / analysis for the major activities.

    Most important characteristics of this project:

        •    Adequacy check and studies of existing Intake Channel feeding the SWI-1 facility, and to propose design modifications required to accommodate the new SWI-3 pump house and meet the additional seawater demand.
        •    Design of Seawater Intake Structure (Pump Bay) to house the new FERTIL Seawater supply pumps.
        •    Dredging study
     

    Dredging study

     Stop Logs and Guide frames packages for isolation purposes.

     Screening:

     Coarse Screens (Bar Rake Screens)

     Fine Screens (Traveling Band Screens)

     Five new Seawater pumps of 17,500 m3/h capacity each

    The Study of the hydraulic behavior of the canals in the pump house by CFD (Computational Fluid Design).

     


 IMAGES OF THE PROJECT

 
NEW SEA WATER INTAKE FACILITIES – IN ABU DHABI, EMIRATES
NEW SEA WATER INTAKE FACILITIES – IN ABU DHABI, EMIRATES
NEW SEA WATER INTAKE FACILITIES – IN ABU DHABI, EMIRATES
NEW SEA WATER INTAKE FACILITIES – IN ABU DHABI, EMIRATES
NEW SEA WATER INTAKE FACILITIES – IN ABU DHABI, EMIRATES

 RELATED PROJECTS

See more projects
STUDY OF THE INTAKE CAISSON ADAPTATION OF THE COMBINED CYCLE POWER PLA...
CONSTRUCTION PROJECT OF THE PUMPING STATION GRANADILLA II (TENERIFE, S...