PRELIMINARY NAUTICAL STUDIES FOR LNG REGASIFICATION PLANT MOORING JETTY

Jetties

  • Start Date / End Date: 2011
  • Place: Huelva (SPAIN)
  • Scope: Preliminary Study Writing.
  • Description:

    The purpose of the study was to define the following prior to writing the Construction Projects for the infrastructures:

        •    Manoeuvring and mooring study: layout and elevation sizing.
        •    Study of the effect of passing ships near the new jetty.

     

    The project ship is the Q-max LNG carrier which has the following maximum characteristics:

        •    Capacity (m3): 266,000 (would be equal to more than 120,000 DWT)
        •    Freeboard length (m): 345.0
        •    Breadth (m): 53.8
        •    Maximum draught (m): 12.0
        •    Depth (m):    34.7
     
     

 IMAGES OF THE PROJECT

 
PRELIMINARY NAUTICAL STUDIES  FOR LNG REGASIFICATION PLANT MOORING JETTY
PRELIMINARY NAUTICAL STUDIES  FOR LNG REGASIFICATION PLANT MOORING JETTY

 RELATED PROJECTS

See more projects
BASIC PROJECT FOR A HYDROCARBON TRANSFER TERMINAL IN THE BAY OF MONTEV...
LIQUID BULK TERMINAL AT PUERTO BAHIA, CARTAGENA, COLOMBIA. OFFSHORE IN...
NEW LNG REGASIFICATION PLANT JETTY PRE-DESIGN...